Sanbell (formerly Jensen Design & Survey, Inc.) manages the Del Sol High School project for the Oxnard Union High School District.
The 100-acre site splits evenly between the new high school campus and Tract 6059, which will become two planned residential communities. Sanbell’s Planning Team led Tract 6059 through the entitlement process, guiding approvals and coordination with local authorities.
The high school portion nears completion, with the Del Sol Jaguars scheduled to open in August 2023. Sanbell’s Engineering Team designed the campus layout, collaborated with architect PBK, and handled civil engineering for grading, water, sewer, storm drains, and stormwater infiltration.
The project also includes major offsite infrastructure upgrades required by the City of Oxnard. Sanbell designed and implemented:
Two new streets flanking the high school on the east and north
Widening of Rose Avenue and Camino del Sol
Upgrades to three existing traffic signals and installation of two new signals
Improvements to the downstream sewer trunk line
Complete water system looping the site
Sanbell worked closely with the city to prepare master plan documents for water, sewer, and storm drain services covering the full 100-acre site. The Survey Team handled all right-of-way dedications and City easements to keep the project on schedule.
This project demonstrates Sanbell’s expertise in school planning, residential development, civil engineering, and infrastructure coordination, delivering an integrated solution for both educational and community development needs.
This project was proudly served by our Ventura, California Office – Connect with our Ventura Office today!