Sanbell (formerly Bellecci & Associates) served as the prime civil engineering firm for this citywide sewer capacity improvement project.
Our team designed upsized sewer pipes, increasing diameters from 6 inches to 8 inches and 8 inches to 12 inches, to improve system performance and reliability.
The project used high-density polyethylene (HDPE) pipe and pipe reaming methods to reduce surface impacts and streamline construction. Sanbell designed approximately 5,044 linear feet of sewer improvements across 14 locations citywide. This required careful coordination and consistent design standards.
Our scope included the removal, replacement, and reconnection of existing sewer laterals to integrate the new infrastructure. Sanbell prepared Plans, Specifications, and Estimates (PS&E) and completed a 65% Basis of Design Report to guide final design and construction.
The team also completed a topographic survey and coordinated closely with the geotechnical engineer to address subsurface conditions and support constructability.
This project was proudly served by our Concord, California office – Connect with our Concord Office today!