This safety project aimed to replace a dangerous horizontal curve and merge three hazardous intersections into a single-lane roundabout. The goal was to improve safety in a high-speed rural area.
Key components included upgrading the storm system, improving subsurface drainage, relocating irrigation pipelines, installing sidewalks, and adding raised median islands. The project also required extensive coordination with agencies, public involvement, and right-of-way (R/W) design and negotiations.
Our role covered hydraulic and irrigation design, traffic improvements, utility mapping, cadastral COS, and topographic surveys. This comprehensive approach helped meet the project’s safety and infrastructure goals.
The project presented several challenges requiring innovative solutions. To improve sight distance and address crash history, we consolidated intersections, widened shoulders, flattened slopes, and designed traversable ditches within the clear zone.
The proximity to substantial wetlands added complexity. We collaborated with MDT Environmental, Confluence, and Weston to conduct wetland delineations and jurisdictional determinations. We also implemented non-standard drainage ditch geometries to minimize environmental impacts. This balanced safety enhancements with environmental stewardship.
This project was proudly served by our Billings, Montana office – Connect with our Billings Office today!





