Turquoise Ridge Shaft #3

Workers conducting quality controls an inspection at the Turquoise mine shaft construction site in Gonconda, Nevada.
Completed in 2023, Nevada’s deepest mine shaft represents a major advancement in underground mining infrastructure.

Sanbell (formerly Summit Engineering Corporation) provided comprehensive soil and concrete inspection and materials testing throughout construction.

The 3,400-foot-deep, concrete-lined shaft has a 24-foot finished diameter and supports Thyssen Mining’s ongoing operations as production shifted away from two existing shafts. The shaft now serves as a critical access point to the primary ore body.

Sanbell performed quality control testing and inspection for the shaft liner, headframe, hoist house foundations, and a newly constructed change house. Our team delivered fast, reliable laboratory results to keep construction on schedule and meet all project quality standards.

Sanbell continues to provide ongoing concrete testing services to support long-term performance and compliance.

Concrete-lined mine shaft under construction at the Turquoise Ridge Mine in Gonconda, Nevada

This project was proudly served by our Elko, Nevada office – Connect with our Elko Office today!

Primary Sanbell Logo

Welcome to Sanbell — The Core Design team is now part of Sanbell, bringing together talented professionals, expanded capabilities, and a shared commitment to serving our clients and communities. You’ll continue working with the same trusted team, now backed by the strength and resources of Sanbell.

Logo for Core Design