Whitman Road Sewer Rehabilitation

Aerial view of Whitman Road sewer replacement project area.
Sanbell (formerly Bellecci & Associates) led surveying and design for a critical sewer infrastructure upgrade on Whitman Street.

Our team completed a detailed topographic survey and designed the replacement and upsizing of approximately 1,600 linear feet of sewer pipe. This in turn increased capacity from 8-inch to 12-inch vitrified clay pipe (VCP).

Sanbell also designed manhole rehabilitation and lateral reconnections or replacements, as needed, to support long-term system performance. The project included a targeted 8-inch VCP spot repair to address localized deficiencies.

The City prioritized trenchless sewer replacement where feasible. Sanbell responded with solutions that addressed site constraints. This included a 10-foot pipe depth and a storm culvert crossing that added design and construction complexity.

This project received the 2024 APWA Northern California Project of the Year Award, recognizing excellence in public works design and delivery.

Existing Whitman Road manhole before trenchless sewer upgrades. Post-construction view of Whitman Road following sewer infrastructure upgrades.

This project was proudly served by our Concord, California office – Connect with our Concord Office today!

Primary Sanbell Logo

Welcome to Sanbell — The Core Design team is now part of Sanbell, bringing together talented professionals, expanded capabilities, and a shared commitment to serving our clients and communities. You’ll continue working with the same trusted team, now backed by the strength and resources of Sanbell.

Logo for Core Design